MAIN INDUSTRIAL ACTIVITIES CARRIED OUT

YEAR 1999

  • Design of detail electric - instrumental for Central Cassano d'Adda carried out on behalf of TERMOSUD S.p.A. - Gioia del Colle (BA).
  • Draft of demolition ENI-Agip's Central of Benevento (BN).
  • Feasibility study for production in co-generation of Electricity from acid gas from marginal sources.

YEAR 2000

  • Detail design for a gas desulphurization plant and Electricity Central production by 10 MW for the U.S. company.
  • Demolition of the Central ENI-Agip of Cupello in ATI with other companies.
  • Projects for SKID re-injection of waste water.
  • Engineering for putting into service plant sludge drying Tecnoparco Valbasento Valley, alteration and start up planting.

YEAR 2001

  • Feasibility study and basic planning for the use of natural gas in the central ENI-Agip of Pisticci - Ferrandina for industries of Basento Valley.
  • Manual scheduled maintenance for detergent production plant.
  • Editing of Technical and Economic Oer to disassembly plant for ammonia and urea site in South Africa for commissioning, reassembly and start-up in China.
  • Feasibility study for the use and distribution of natural gas in the Basento Valley (Pisticci - Ferrandina).
  • System recovery gaseous euents Central gas Crotone (KR).
  • Carrying out of the cooling system process gases Central of Roseto Valfortore (FG).
  • Editing of Technical and Economic Oer to build a pipeline from 34" along 90 kilometres in Libya.

YEAR 2002

  • Enlargement STOGIT Control Room of Cupello (CH) and electrical installations planning, re and air conditioning system.
  • Adaptation to semi-oil sewers for oil and gas STOGIT Central of Cupello (CH).

YEAR 2003

  • Open contract acquisition ENI S.p.A. Div. E. & P. for major improvements and changes beside facilities on and o-shore.
  • Detail Engineering by inserting new unit of heating oil at the ENI S.p.A. Oil Centre of Pisticci (MT).
  • Engineering for civil works (networks buried) at the ENI S.p.A. Oil Centre of Val D'Agri (PZ).
  • Demolition of desulphurisation plant of ENI S.p.A. Gas Central of Salandra in Temporary Association of Companies (ATI) with other companies (ongoing activities).

YEAR 2004

  • Various improvement projects and changes to the Gas Station, to Oil Centres and well areas ENI S.p.A. Crotone (KR), Val D'Agri (PZ), Pisticci and Ferrandina with open contract.
  • Detail planning skid "Urea reactor" to EDIPOWER and frame and lifting report calculation - Brindisi (BR).
  • Detailed design and construction management process for collecting systems and network of industrial water for ENI S.p.A. Oil Center DI.ME. - Val d'Agri (PZ).
  • Verify of basic engineering and detailed engineering development with preparation of documentation for certication of Conformity with Directive 97/23/EC (PED) of the pressure equipment inherent Well Area V1 - OR of ENI S.p.A. - Val d'Agri (PZ).
  • Check for new operating conditions of ow-line Ø 4 " for connection with Well Areas CF1 and CF2 of ENI S.p.A. - Val d'Agri (PZ).
  • Basic design and execution of a sound-proof shed to protect a gas compressor, complete with monitoring for detecting explosive mixtures at ENI S.p.A. Oil Center of Pisticci (MT).
  • Feasibility study for shielding from sunlight-cooler and the air cycle refrigerator of ENI S.p.A. Candela (FG).
  • Study for the revamping of the circuits of re for Oil Center of Pisticci (MT) and Torrente Tona ENI S.p.A. Gas Central.

YEAR 2005

  • Varius projects of improvements and modications to the Gas Central, Oil Center and the Well Areas ENI S.p.A. of Crotone (KR), Val d'Agri (PZ), Pisticci (MT), Ferrandina (MT), Candela (FG), Torrente Tona (CB), Roseto Valfortore (FG) on open contract.
  • Execution of isometric bottom lines of the build Central Turbogas EDISON of Torviscosa (UD).
  • Verication of basic and detailed design of mechanical equipment for Cluster Areas insistent on SR 8 and PA 35 of ENI S.p.A. - Candela (FG).
  • Verify the basic engineering and detailed engineering development with preparation of documentation for certication of Conformity at Directive 97/23/EC (PED) of the pressure equipment to be installed in the ENI S.p.A. Cluster Area CF 5/8/10 - Val d'Agri (PZ)./li>
  • Reclassification of Hazardous Areas for ENI S.p.A. Oil Centre of Pisticci (MT).
  • Adaptation to D.Lgs. 624/96 for the safety relating for the Well and Cluster Areas of the ENI S.p.A. Gas Central of Candela (FG), Roseto Valfortore (FG), Pisticci - Ferrandina (MT).
  • Drafting cadastral map and prole of the horizontal and vertical alignment of the ENI S.p.A. Oil Center Networks of Pisticci (MT).
  • Check the project and preparing tender notice for the reactivation of the Plant of remote control and remote monitoring of Gas Stations of Ferrandina - Pisticci and Oil Center Pisticci from ENI S.p.A. Oil Center Val D'Agri (PZ).

YEAR 2006

  • Engeneering design and detailed design for the "Strengthening the gas compression" for the ENI S.p.A. Gas Central of Pisticci (MT) and Roseto Valfortore (FG).
  • Precommissioning, Commissioning and Start-up for the semi-oily sewage and white wather at the STOGIT S.p.A. Gas Central Treatment of River Treste - Cupello (CH).
  • Drafting of the calculations and nal design for calm reservoir of water stratus from 30 mc for B-Daria skid platform - ENI S.p.A. Field of Cervia (RA).
  • Redesign, construction supervision and coordination of security at the site of the LATERZA PETROLI S.r.l. new Fuel Depot site in Santeramo in Colle (BA).
  • Perform eld surveys, drafting of isometric drawing installations and modications on behalf of FOSTER WHEELER ITALIAN S.p.A. at the PFIZER S.p.A. Plant of Pisticci (MT).

YEAR 2007

  • Editing design and detailed engineering drawing for "Refrigeration System gas brine for delivery to Edison" for ENI S.p.A. Gas Central of Candela (FG).
  • Editing design and detailed engineering for "Adaptation and production start Well Areas Palino 14 - 21 and Palino Carapelle 2" ENI S.p.A. Gas Field of Candela (FG).
  • Preparation of documentation for obtaining the Certication of Conformity with Directive 97/23/EC (PED) of pressure equipment making up the refrigeration system installed downstream of the gas compression at Metaponto (MT) Gas Central for Italian Gas Plus S.p.A.
  • Preparation of the ISPESL practice (Decree 01/12/2004, No. 329, Art. 6) for the commissioning of the refrigeration gas installed downstream of the compression at Metaponto (MT) Gas Central of the Italian Gas Plus S.p.A.
  • Preparation of documentation for Certication of Conformity with Directive 97/23/EC (PED) for the pressure equipment forming part of the Gas Compression A. P. installed at the ENI S.p.A. Div E & P. Gas Central of Pisticci (MT).

YEAR 2008

  • Preparation of technical dossiers and bureaucratic coordination for the CE Certication of Conformity (Directive 97/23/EC - PED) of two pipes Ø40 " (intake air booster blower) forming part of the ILVA S.p.A. OXIAL Plant in Taranto (TA).
  • Detailed engineering on the distribution of utilities analysis booths 34-AH-34001 and 34-AH-34002 installed at the ENI S.p.A. Renery of San Nazzaro D. B. (PV).
  • Audit service maintenance of the assets owned by the Consortium for Industrial Development of the Province of Matera entrusted to the management company Technoparco Valbasento S.p.A. - Pisticci (MT).
  • Detailed Engineering, Supervision, Coordination of Safety during the design and execution for the pilot plant research for the production of enzymes by solid state fermentation (SSF) at Metapontum Agrobios S.r.l. - Bernalda Metaponto (MT).

YEAR 2009

  • Support Services for the authorization beside the construction of a Foster Wheeler Italy S.p.A. combined cycle Power Plant - Salandra (MT).
  • Preparation of technical dossiers and bureaucratic coordination for the CE certication of conformity (Directive 97/23/EC - PED) of four lines Ø3" and one line Ø6" in support of the sea-line connection between the ENI S.p.A. Giovanna Platform and the Central Gas - Pineto (TE).
  • Check the detailed engineering, preparation of technical dossiers and bureaucratic coordination for the construction and CE certication of conformity (Directive 97/23/CE-PED) for ENI S.p.A. Cluster Area AGRI 1 / CF6 / CF9 - Val d'Agri (PZ).
  • Detailed Engineering, preparation of technical dossiers and bureaucratic coordination for the CE certication of conformity (EC Directive 97/23/CE-PED) of new lines installed in front of insertion of the new ENI S.p.A. Gas Compressor Central - Pineto (TE).
  • Preparation of technical dossiers and bureaucratic coordination for the CE certication of conformity (EC Directive 97/23/EC - PED) of eight pipes Ø 40" (air / nitrogen process) installed in Unit VI and VIII of oxygen and nitrogen production by ILVA S.p.A. Plant of Taranto (TA).
  • Drafting technical dossier and bureaucratic coordination for the CE certication of conformity (EC Directive 97/23/EC - PED) of the ow-line Ø 4"output from the wellhead of Well Area Gela 7 the property of ENIMED S.p.A. - Gela (CL).

YEAR 2010

  • Detailed Engineering for interconnecting input of No. 2 Gas Compressor in ENI S.p.A. Gas Central - Crotone (KR).
  • Deployment of ISPESL practical, according to D.Lgs. 25/02/2000, No. 93, Art. 19 (DM 01/12/04, n. 329), for the commissioning and use of pressure equipment mounted in support of the new gas compressor A360-KA-401 of the ENI S.p.A. Gas Central - Pineto (TE).
  • Certication of proper installation and operation according to the DPR 12/01/98 and DM 04/05/98 of the plugs fuses network and powder re extinguisher network to protect the new compressor A360-KA-401 of the ENI S.p.A. Gas Central of Pineto (TE) issued by a qualied engineer and registered to the M.I. according to L. of 07/12/84, No. 818.
  • Preparation of technical dossier for CE certication of conformity (Dir. 97/23/EC - PED) for No. 10 lines of cat. II kit installed in the insertion of new units drying gas (TEG) in the STOGIT Gas Central of Sergnano (CR).
  • Services of retrieval, updating and organizing the technical documentation necessary for the disassembly and reassembly at the building DARAMIC J.V. China, Production accessories batteries Lines No.1 and 2 of 'ex-factory DARAMIC S.p.A. Tito Scalo (PZ).
  • Detailed engineering drawing and technical dossier for CE declaration of conformity (Dir. 97/23/EC - PED) of a new air distribution manifold Process DN 200 (Cat. I - mod. "A") installed in the Freudenberg-Politex S.r.l. factory at Pisticci Scalo (MT).
  • Mechanical engineering services for the construction of ENI S.p.A. Well Areas Cerro Falcone 3/4, Cerro Falcone 1 (PZ) including the technical dossier for the CE certification and declaration of conformity (Dir. 97/23/EC - PED) of the lines of cat. III (model "G"), II (model "A1"), I (model "A") and Art. 3.3. (workmanlike).
  • Mechanical engineering services for installation in ENI S.p.A. Oil Center at Val d'Agri (PZ) of a refrigeration MDEA including the technical dossier for qualification and CE certification of conformity (Dir. 97/23/EC - PED) of the constituent units of refrigeration equipment (skid screw compressors, oil separators, evaporator, condenser tube bundles, skid brine, receiver bin).
  • Detailed design of a new process air distribution manifold DN 250 installed in the Tecnoparco Valbasento S.p.A. factory at Pisticci (MT) and drafting of the technical dossier for CE declaration of conformity (Dir. 97/23/EC - PED) for pressure equipment cat. I (model "A").

YEAR 2011

  • Mechanical engineering services for the construction of ENI S.p.A. Well Area Cerro Falcone 2 (PZ) including the preparation of technical dossiers for certification and the CE declaration of conformity (Dir. 97/23/EC - PED) of the lines of cat. III (model "G"), II (model "A1"), I (model "A"), Art. 3.3. (workmanlike) and tank collecting vents and drains (upgrading).
  • Engineering for assembly plants in the ENI S.p.A. Well Area MA1N - ME3 (PZ) for setting up a production after W.O.
  • Preparation of technical dossier for CE certication of conformity (Dir. 94/9/EC - ATEX) in accordance with Annex VIII "internal production control" for hoods soundproong to be installed on gas lines above ground control locations outside SNAM RETE GAS S.p.A. building.
  • Assistance at the decades general stop of the ENI S.p.A. Oil Center at Val d'Agri (PZ) conducting activities such as mechanical engineering, dimensional measurements on piping, eld supervision, technical dossier for CE certication of conformity (Dir. 97/23/EC - PED).
  • Activities of Engineering (Civil and Mechanical Section) on the collection of rst rain water and the adjustment of the drainage system ENI S.p.A. Ionica Gas Company Central at Crotone (KR).
  • Engineering Services for review, modication and construction of mining locations and coiling tubes at the Step One S.r.l. establishment of Tito Scalo (PZ) (formerly Plant DARAMIC S.p.A.).

YEAR 2012

  • Preparation of technical documentation for the CE certication of conformity overall (Dir. 97/23/EC - PED) of ENI S.p.A. Well Area Cerro Falcone 1 (cat. IV-mod. G).
  • Preparation of technical documentation for the commissioning of the subject pressure equipment of ENI S.p.A. Well Areas Cerro Falcone 3-4/5-8 (ref. Ministerial Decree 329/04).
  • Activities of mechanical engineering, electrical and instrumental for modied discharge Oil shelters for allow the loading of tank trucks with water stratum and backwash water at the ENI S.p.A. Oil Centre - Val d'Agri (PZ).
  • Activities of mechanical engineering for the insertion of a measuring gas skid tax at the ENI S.p.A. Gas Central of Candela - Candela (FG).